Assume a body shop with 3 body technicians, 1 paint technician and 1 estimator with a labor rate of $50.00 per hour. If each Body technician produces 60 hours per week at $50.00 per hour they each produces $3000.00 of shop revenue per week.
We now have 3 Technicians producing a combined revenue of $9000.00 per week, we can now divide a 40 Hour week into the total sum of $9000.00 to equal $225.00 of revenue produced per hour for 3 Technicians.
At $225.00 per hour we can now find the rate of revenue a 3 Body technician shop can produce each Minute in a 40 hour week.
At $225.00 of revenue per hour divided by 60 Minutes equals $3.75 per minute.
When using the Crash Manager System a Body Shops estimator should save 5 to 15 minutes of time for
Each vehicle they write an initial repair plan while having a more complete and accurate sheet.
As the vehicle starts its repair process, the technicians and estimator should save 5 to 15 minutes of
Time per each vehicle in finalizing the repair plan during the disassembly.
In a body shop having 3 Technicians saving an average of 10 minutes each with a total combined 30
Minutes per there 3 vehicles while using the Crash Manager System, A savings of 30 minutes x 3.75 a
Minute of flat rate revenue would equal 112.50 savings for just 3 cars the three technicians work on.
We may also have an added time and revenue savings if including the Estimators time the parts person and painters unseen time saved for the overall repair process.